Test the change before you spend on it.
LinkSim models your manufacturing and operational systems with discrete event simulation — production flows, machine utilisation, resources, bottlenecks, cycle times and throughput — so decisions get rehearsed instead of gambled.
The problem it removes.
Adding a new line, changing a shift schedule, or re-routing materials usually requires expensive trial-and-error during live production.
LinkSIM simulates process changes using live plant data — predicting throughput bottlenecks, energy peaks, and operator workloads before you spend a single rupee on execution.
What it does.
If we add one machine to line 3…
…what does throughput actually become in shifts?
Where is the real bottleneck…
…and where does it move once we fix this current one?
Can the current layout support more volume…
…or do we need a physical plant expansion?
What does a third shift produce…
…net of changeover parameters and manpower constraints?
Which of these three layout options…
…is worth the financial expenditure?
For greenfield projects, LinkSim earns its keep before a single machine is ordered — validating layout, capacity and material flow at the design stage, when changes cost nothing.
ENGAGEMENT MODEL // We build the model from engineering CAD drawings and machine specs. Where Link360 is active, we feed the simulator live parameters to keep predictions accurate.
Bring us one decision you're about to make.
A one-hour walkthrough at your site. We'll point at real machines and tell you exactly what we'd measure, what it costs, and what it saves. No slide deck.